Project Schedule

* attempting to run both StoneBridge projects (Universal Restoration and Waste Container Rentals) parallel to eachother

  • COMPLETE 09/25/2018 – content from Jennifer due, begin blueprints
    • 09/26/2018 received half of content, starting blueprints anyway
  • COMPLETE 10/05/2018 – blueprint approval, begin designs
    • 10/05/2018 blueprint v2 approved (still don’t have image content)
  • COMPLETE 10/17/2018 – design approval, begin build
    • 06/22/2019 design approved, beginning build
  • IN PROGRESS 10/31/2018 – build complete, begin final review
    • 07/16/2019 build complete, starting final review
  • 11/05 – launch week of 11/05/2018

Contact Information

StoneBridge

Jennifer Schlachter
(904) 262-6636
jennifer@stonebridgebuilt.com

Elyk Innovation

Chris Edwards
(904) 998-1935
cedwards@elykinnovation.com


Success Factors

Our experience indicates that when a project goes “exactly as planned” there are several key elements that were in place.

  1. We have one primary contact and that person remains in place from beginning to end.
  2. The primary contact has time to commit to the project.
  3. Everyone involved in the project reads our new client guide. - Download New Client Guide
  4. The content is developed, updated, formatted and delivered by a professional copywriter.
  5. Deadlines are realistic and adhered to.
  6. Communication is wide open.
  7. If we run into road blocks, everyone is focused on a solution.

Schedule


Content


Content Approval

The Client approves this content and authorizes the Consultant to proceed with the development of wireframes. The Client acknowledges that content changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by Jennifer Schlachter (jennifer@stonebridgebuilt.com) on 10/25/2018

Wireframes

Round 1

Homepage

Round 2

Homepage

Services Page


Wireframe Approval

The Client approves the wireframe(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of designs. The Client acknowledges that wireframe changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by Jennifer Schlachter (jennifer@stonebridgebuilt.com) on 10/05/2018

Designs

Round 1

Design 1


Round 2

original banner

single client image banner

before/after client image banner

before/after stock image banner


Round 3

Homepage


Design Approval

The Client approves the design(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of the website. The Client acknowledges that design changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by Dale Lesko (dale@universalrestoration.net) on 06/22/2019