Success Factors

Our experience indicates that when a project goes “exactly as planned” there are several key elements that were in place.

  1. We have one primary contact and that person remains in place from beginning to end.
  2. The primary contact has time to commit to the project.
  3. Everyone involved in the project reads our new client guide. - Download New Client Guide
  4. The content is developed, updated, formatted and delivered by a professional copywriter.
  5. Deadlines are realistic and adhered to.
  6. Communication is wide open.
  7. If we run into road blocks, everyone is focused on a solution.

Schedule

Wireframes Complete - (Week of 10/16) - In Progress

Designs Complete - (Week of 10/30)

Build Complete - (Week of 11/13)

Testing Complete - (Week of 11/27)

Launch - (Week of 12/4)


Content


Content Approval

The Client approves this content and authorizes the Consultant to proceed with the development of wireframes. The Client acknowledges that content changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by content carries over from current site (approved@email.com) on 10/06/2017

Wireframes

Round 1

Home Page

Round 2

Home Page

After Log In

Sub Page (Time and Money)


Wireframe Approval

The Client approves the wireframe(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of designs. The Client acknowledges that wireframe changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by Jim Novak (jim@tonersplus.biz) on 10/17/2010

Designs

Round 1

Home

Home Alt


Round 2

Home

Home (Alt Banner)

Home (Alt Banner 2)


Design Approval

The Client approves the design(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of the website. The Client acknowledges that design changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by Jim Novak (jim@tonersplus.biz) on 10/17/2010