Superior Construction Home Page Redesign

superior-construction.com

Contact Information

Superior Construction

John Lewis
(219) 886-3728
JLewis@sccinc.com

Elyk Innovation

Ramsey Crowe
(904) 998-1935
rcrowe@elykinnovation.com


Success Factors

Our experience indicates that when a project goes “exactly as planned” there are several key elements that were in place.

  1. We have one primary contact and that person remains in place from beginning to end.
  2. The primary contact has time to commit to the project.
  3. Everyone involved in the project reads our new client guide. - Download New Client Guide
  4. The content is developed, updated, formatted and delivered by a professional copywriter.
  5. Deadlines are realistic and adhered to.
  6. Communication is wide open.
  7. If we run into road blocks, everyone is focused on a solution.

Schedule


Content


Content Approval

The Client approves this content and authorizes the Consultant to proceed with the development of wireframes. The Client acknowledges that content changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by N/A (N/A) on 01/01/2016

Wireframes


Wireframe Approval

The Client approves the wireframe(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of designs. The Client acknowledges that wireframe changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by N/A (N/A) on 01/01/2016

Designs

Home Page Mock-up 1

Home Page


Home Page Mock-up 2

Home Page


Home Page Mock-up 3

Home Page Slide A

Home Page Slide B


Home Page Mock-up 4

Home Page


Design Approval

The Client approves the design(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of the website. The Client acknowledges that design changes requested after the signature date below will result in additional fees that are not included in the original contract.

Additional Notes

When new Home Page design is built we will:

  • remove “Business Opportunities” from the footer
  • change out some of the icons; new icons will be provided by client

This approval was electronically signed by Raymond Skelton (rskelton@superiorse.com) on 03/23/2016