Success Factors

Our experience indicates that when a project goes “exactly as planned” there are several key elements that were in place.

  1. We have one primary contact and that person remains in place from beginning to end.
  2. The primary contact has time to commit to the project.
  3. Everyone involved in the project reads our new client guide. - Download New Client Guide
  4. The content is developed, updated, formatted and delivered by a professional copywriter.
  5. Deadlines are realistic and adhered to.
  6. Communication is wide open.
  7. If we run into road blocks, everyone is focused on a solution.

Schedule

Initial content due - (4/3/17)

Primary content due - (4/17/17)

Wireframes complete, start designs - (3/6/17)

Designs complete, start build - (4/10/17)

Build complete, testing and final review - (4/10/17)

Launch - (5/1/17)


Content


Content Approval

The Client approves this content and authorizes the Consultant to proceed with the development of wireframes. The Client acknowledges that content changes requested after the signature date below will result in additional fees that are not included in the original contract.


Wireframes

Round 01

Home Page

Sub-page: Member's Area

Round 02

Home Page

Sub-page: Member's Area

Round 3

Home Page

Home Page w/dropdown

Round 4

Home Page

Home Page w/dropdown


Wireframe Approval

The Client approves the wireframe(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of designs. The Client acknowledges that wireframe changes requested after the signature date below will result in additional fees that are not included in the original contract.

Name Email Date

Designs

Round 1

Design 1-1

Design 1-2


Design Approval

The Client approves the design(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of the website. The Client acknowledges that design changes requested after the signature date below will result in additional fees that are not included in the original contract.

This approval was electronically signed by Cathy Hagan (chagan@unf.edu) on 03/16/2017