Our experience indicates that when a project goes “exactly as planned” there are several key elements that were in place.

  1. We have one primary contact and that person remains in place from beginning to end.
  2. The primary contact has time to commit to the project.
  3. Everyone involved in the project reads our new client guide. - Download New Client Guide
  4. The content is developed, updated, formatted and delivered by a professional copywriter.
  5. Deadlines are realistic and adhered to.
  6. Communication is wide open.
  7. If we run into road blocks, everyone is focused on a solution.

Schedule

Content complete - (3/21)

note client travels to Japan for 2 weeks

Wireframes complete - (4/20 )

Designs complete - (5/4)

Build compelete - (5/18)

Target launch date - (5/29)


Content


Content Approval

The Client approves this content and authorizes the Consultant to proceed with the development of wireframes. The Client acknowledges that content changes requested after the signature date below will result in additional fees that are not included in the original contract.


Wireframes

Round 1

Home

Home (alt)

Scrap Recycling

Metal Fabrication

Timeline

Round 2

Home

Scrap Recycling (Quick Dispatch Form)

Scrap Recycling (No Form)

Metal Fabrication

Timeline (Thumbnail Pics)

Timeline (No Vid, slideshow pics)

Timeline (Slideshow pics w/ vid)

Round 3

Home

Home (Expanded Form)

Scrap Recycling

Metal Fabrication

Timeline

New Steel

Round 4

Home (Footer Option 1)

Home (Expanded Form, Footer Option 2)

Scrap Recycling

Metal Fabrication (Portfolio option 1)

Metal Fabrication (Portfolio option 2)

Metal Fabrication (Portfolio option 3)

Timeline

New Steel

Round 5

Home

Home (Expanded Form)

Scrap Recycling

Metal Fabrication

New Steel

Pipes (New Steel sub page)

Timeline

Round 6

Home

Home (Expanded form)

Scrap Recycling

Timeline

New Steel

Metal Fabrication

Metal Fabrication (Alt)

Pipes

Round 7

Home

Home (Expanded form)

Scrap Recycling

Timeline

Metal Fabrication

New Steel

New Steel (Alt)

Pipes


Wireframe Approval

The Client approves the wireframe(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of designs. The Client acknowledges that wireframe changes requested after the signature date below will result in additional fees that are not included in the original contract.

Name Email Date

Designs

Round 1

Home

Home (Expanded)

Home (Alt)

New Steel

Metal Fabrication


Round 2

Home (New Hero)

Home (Expanded Form - Red)

Home (Expanded Form - Logos)

Home Alt (Old Hero, B&W, Logos in Footer)

New Steel (Blue Button for Comparison)

Metal Fabrication


Round 3

Home

Home (Expanded form. White logo in footer for comparison)

Metal Fabrication


Round 4

Home

Home (Expanded)

New Steel

Metal Fabrication

Scrap Recycling


Design Approval

The Client approves the design(s) above with the green check mark(s) and authorizes the Consultant to proceed with the development of the website. The Client acknowledges that design changes requested after the signature date below will result in additional fees that are not included in the original contract.

Name Email Date